Professional installation is essential to ensure the safety, stability, and long-term performance of Ocean Outdoor Playground Equipment.        The following installation steps will guide you through the standard installation process.

1. Site Measurement & Preparation
           Determine site dimensions and safety zone boundaries, and clear debris and obstacles from the site.
           Measure and mark the installation plane positions of columns and supports according to drawings.
Step 1 - Site Measurement
2. Column & Structure Installation
       Install columns and loadbearing structures according to the drawings.
       Use expansion bolts and washers to connect the columns.
       Tighten them and then correct the overall verticality and level.
3. Platform & Railing Installation
       Install the platforms, railings, and safety panels and fix with screws.
4. Functional Components Installation
           Then install slides, climbing nets, climbing walls, and other functional components, and check if the connections are secure.
           Adjust the gaps and angles between components for optimal play experience.
Step 4 - Install Functional Components
5. Fastener Checking & Tightening
       Use a torque wrench to check and tighten all fasteners, confirm there are no missing screws or loose parts.
6. Site Cleanup & Final Acceptance
       Clean up construction debris and leftover materials and check the surrounding ground for safety.
       Finally confirm the finished result with the client.

Ocean Play will provide to ensure accurate and safe installation:

Standard installation guide document            On-site technical support and installation instructions            Accessory labeling and step numbering assistance

Installation Complete